Fields: PALO DURO CREEK (RED CAVE)
Cum Oil
0 BBL
Cum Gas
623k MCF
Wells
1
Production
1994-04 — 2026-03
Peak Month
1995-01
Production History
Cum Oil: 0 BBL Cum Gas: 623,009 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-421-00982 | PHILLIPS PETROLEUM COMPANY | 1 | 2,065 | 1993-10-21 |