Fields: PLACEDO (4300 CATAHOULA)
Cum Oil
0 BBL
Cum Gas
96k MCF
Wells
1
Production
1993-01 — 2002-09
Peak Month
1996-03
Production History
Cum Oil: 0 BBL Cum Gas: 96,040 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 8 | 42-469-31821 | STONE, J. G. OIL CO. | 2 | 5,500 | 1990-12-14 |