Fields: EL GATO (LOBO)
Cum Oil
0 BBL
Cum Gas
7.7M MCF
Wells
1
Production
1993-01 — 2026-03
Peak Month
1993-01
Production History
Cum Oil: 0 BBL Cum Gas: 7,654,440 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 7 | 42-479-33287 | GETTY OIL CO. | 1 | 9,006 | 1982-03-23 |