Fields: EL GATO (LOBO)
Cum Oil
0 BBL
Cum Gas
671k MCF
Wells
1
Production
1993-01 — 2026-03
Peak Month
1993-01
Production History
Cum Oil: 0 BBL Cum Gas: 670,754 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 19 | 42-479-34742 | GETTY OIL CO. | 1 | 10,000 | 1988-10-03 |