Fields: EL GATO (LOBO)
Cum Oil
0 BBL
Cum Gas
340k MCF
Wells
1
Production
1993-01 — 2026-03
Peak Month
2002-02
Production History
Cum Oil: 0 BBL Cum Gas: 340,272 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 20 | 42-479-34841 | GETTY OIL CO. | 1 | 10,100 | 1989-04-10 |