Fields: MUNOZ (LOBO)
Cum Oil
0 BBL
Cum Gas
1.1M MCF
Wells
1
Production
1994-07 — 2026-03
Peak Month
1994-10
Production History
Cum Oil: 0 BBL Cum Gas: 1,092,876 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 16-T | 42-505-33192 | TRANSTEXAS GAS CORPORATION | 2 | 14,000 | 1994-09-08 |