Fields: PITA ISLAND (J-02)
Cum Oil
0 BBL
Cum Gas
1.6M MCF
Wells
1
Production
1994-05 — 2026-03
Peak Month
1994-09
Production History
Cum Oil: 0 BBL Cum Gas: 1,584,389 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 11R | 42-355-32945 | TEXAS CRUDE ENERGY, INC. | 2 | 14,975 | 2003-08-13 |