Fields: PITA ISLAND (J-64, 77)
Cum Oil
0 BBL
Cum Gas
2.2M MCF
Wells
1
Production
1994-04 — 2026-03
Peak Month
1994-06
Production History
Cum Oil: 0 BBL Cum Gas: 2,174,432 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 8 | 42-355-31622 | TEXAS CRUDE ENERGY, INC. | 5 | 11,500 | 2002-03-07 |