Fields: VISTA DEL MAR (MIOCENE 7150)
Cum Oil
0 BBL
Cum Gas
7k MCF
Wells
1
Production
1999-09 — 2026-03
Peak Month
2006-03
Production History
Cum Oil: 0 BBL Cum Gas: 6,984 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-061-30481 | SHERIDAN ENERGY,INC. | 4 | 9,700 | 1998-02-24 |