Fields: EL PAISTLE, DEEP (FRIO)
Cum Oil
0 BBL
Cum Gas
2.4M MCF
Wells
1
Production
2001-09 — 2024-11
Peak Month
2001-11
Production History
Cum Oil: 0 BBL Cum Gas: 2,370,957 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-261-31267 | EXXON MOBIL CORPORATION | 1 | 20,000 | 2001-04-13 |