Fields: EL GATO (LOBO)
Cum Oil
0 BBL
Cum Gas
2.1M MCF
Wells
1
Production
1993-01 — 2026-03
Peak Month
1993-12
Production History
Cum Oil: 0 BBL Cum Gas: 2,119,064 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-479-32693 | GETTY OIL CO. | 1 | 10,300 | 1980-05-02 |