Fields: EL GATO (LOBO)
Cum Oil
0 BBL
Cum Gas
862k MCF
Wells
1
Production
1993-01 — 2026-03
Peak Month
1995-09
Production History
Cum Oil: 0 BBL Cum Gas: 861,590 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 3 | 42-479-32980 | GETTY OIL CO. | 1 | 9,000 | 1981-03-06 |