Fields: EL GATO (LOBO)
Cum Oil
0 BBL
Cum Gas
4.7M MCF
Wells
1
Production
1993-01 — 2026-03
Peak Month
1993-01
Production History
Cum Oil: 0 BBL Cum Gas: 4,667,496 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 4 | 42-479-33192 | GETTY OIL CO. | 1 | 9,070 | 1981-11-16 |