Fields: CARTHAGE (HAYNESVILLE SHALE)
Cum Oil
0 BBL
Cum Gas
9.2M MCF
Wells
1
Production
2022-02 — 2026-03
Peak Month
2022-03
Production History
Cum Oil: 0 BBL Cum Gas: 9,211,869 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1H | 42-365-38674 | ROCKCLIFF ENERGY OPERATING LLC | 2 | 13,000 | 2021-07-14 |