Fields: CARTHAGE (HAYNESVILLE SHALE)
Cum Oil
0 BBL
Cum Gas
6.6M MCF
Wells
1
Production
2022-02 — 2026-03
Peak Month
2022-03
Production History
Cum Oil: 0 BBL Cum Gas: 6,590,743 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 3H | 42-365-38676 | ROCKCLIFF ENERGY OPERATING LLC | 2 | 13,000 | 2021-07-14 |