Fields: CARTHAGE (HAYNESVILLE SHALE)
Cum Oil
0 BBL
Cum Gas
7.0M MCF
Wells
1
Production
2022-06 — 2026-03
Peak Month
2022-08
Production History
Cum Oil: 0 BBL Cum Gas: 7,043,539 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1H | 42-203-35472 | ROCKCLIFF ENERGY OPERATING LLC | 1 | 13,000 | 2021-08-19 |