Fields: CARTHAGE (HAYNESVILLE SHALE)
Cum Oil
0 BBL
Cum Gas
10.1M MCF
Wells
1
Production
2022-09 — 2026-03
Peak Month
2022-10
Production History
Cum Oil: 0 BBL Cum Gas: 10,066,654 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 9H | 42-365-38740 | ROCKCLIFF ENERGY OPERATING LLC | 2 | 13,000 | 2022-03-22 |