Fields: CARTHAGE (HAYNESVILLE SHALE)
Cum Oil
0 BBL
Cum Gas
6.6M MCF
Wells
1
Production
2023-09 — 2026-03
Peak Month
2024-08
Production History
Cum Oil: 0 BBL Cum Gas: 6,610,147 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 4HB | 42-005-30487 | AETHON ENERGY OPERATING LLC | 3 | 16,500 | 2023-03-27 |