Fields: CARTHAGE (HAYNESVILLE SHALE)
Cum Oil
0 BBL
Cum Gas
8.9M MCF
Wells
1
Production
2023-07 — 2026-03
Peak Month
2023-09
Production History
Cum Oil: 0 BBL Cum Gas: 8,929,760 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2H | 42-365-38822 | ROCKCLIFF ENERGY OPERATING LLC | 2 | 13,000 | 2022-11-22 |