Fields: EAGLEVILLE (EAGLE FORD-1)
Cum Oil
161k BBL
Cum Gas
0 MCF
Wells
1
Production
2019-05 — 2026-03
Peak Month
2019-05
Production History
Cum Oil: 161,057 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
20,235 BBL/mo
Di (annual)
450.1%
b-factor
0.8
EUR
196,822 BBL
R-squared
0.959
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 4H | 42-283-36647 | MATADOR PRODUCTION COMPANY | 1 | 8,000 | 2019-01-09 |