Fields: BUFFALO RIDGE (BEND)
Cum Oil
39k BBL
Cum Gas
0 MCF
Wells
1
Production
1996-08 — 2026-03
Peak Month
1996-09
Production History
Cum Oil: 39,173 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
3,234 BBL/mo
Di (annual)
112.0%
b-factor
0.1
EUR
38,511 BBL
R-squared
0.971
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-103-34431 | COSTILLA PETROLEUM CORPORATION | 2 | 10,500 | 2000-01-10 |