Fields: PHANTOM (WOLFCAMP)
Cum Oil
992k BBL
Cum Gas
0 MCF
Wells
3
Production
2010-03 — 2026-03
Peak Month
2012-12
Production History
Cum Oil: 992,384 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
20,499 BBL/mo
Di (annual)
54.8%
b-factor
0.2
EUR
561,077 BBL
R-squared
0.768
type
hyperbolic
Wells (3)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1H | 42-475-35515 | ANADARKO PETROLEUM CORPORATION | 3 | 16,000 | 2017-04-21 |
| 2H | 42-475-35711 | ANADARKO PETROLEUM CORPORATION | 2 | 16,000 | 2017-04-21 |
| 3H | 42-475-36039 | ANADARKO PETROLEUM CORPORATION | 1 | 16,000 | 2012-03-24 |