Fields: JAILHOUSE (FUSSELMAN)
Cum Oil
413 BBL
Cum Gas
0 MCF
Wells
1
Production
2014-08 — 2015-12
Peak Month
2014-08
Production History
Cum Oil: 413 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
149 BBL/mo
Di (annual)
938.8%
b-factor
0.3
EUR
274 BBL
R-squared
0.763
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-173-36477 | LAREDO PETROLEUM, INC. | 2 | 12,000 | 2015-08-17 |