Fields: PHANTOM (WOLFCAMP)
Cum Oil
207k BBL
Cum Gas
0 MCF
Wells
1
Production
2024-02 — 2026-03
Peak Month
2024-03
Production History
Cum Oil: 207,004 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
16,669 BBL/mo
Di (annual)
90.7%
b-factor
0.0
EUR
220,564 BBL
R-squared
0.792
type
exponential
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 11UA | 42-475-38632 | CALLON PETROLEUM OPERATING CO | 2 | 12,100 | 2023-06-06 |