Fields: PHANTOM (WOLFCAMP)
Cum Oil
169k BBL
Cum Gas
0 MCF
Wells
1
Production
2024-05 — 2026-03
Peak Month
2024-06
Production History
Cum Oil: 168,785 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
14,301 BBL/mo
Di (annual)
102.6%
b-factor
0.0
EUR
167,385 BBL
R-squared
0.507
type
exponential
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 11UA | 42-475-38696 | CALLON PETROLEUM OPERATING CO | 2 | 11,800 | 2023-11-08 |