Fields: BALE (CLEARFORK)
Cum Oil
172k BBL
Cum Gas
0 MCF
Wells
1
Production
1996-04 — 2026-03
Peak Month
1997-03
Production History
Cum Oil: 171,813 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
2,108 BBL/mo
Di (annual)
30.1%
b-factor
0.4
EUR
132,636 BBL
R-squared
0.855
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 4 | 42-165-30099 | CHAMPLIN EXPLORATION, INC. | 1 | 8,700 | 1996-03-18 |