Fields: BOONE (CADDO)
Cum Oil
12k BBL
Cum Gas
0 MCF
Wells
1
Production
1993-01 — 2026-03
Peak Month
1993-01
Production History
Cum Oil: 12,225 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
253 BBL/mo
Di (annual)
30.5%
b-factor
0.2
EUR
12,317 BBL
R-squared
0.836
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-009-38206 | DENOCO INC. | 2 | 5,300 | 1992-09-29 |