Fields: SERBIN (TAYLOR SAND)
Cum Oil
19k BBL
Cum Gas
0 MCF
Wells
1
Production
1993-01 — 2026-03
Peak Month
1993-03
Production History
Cum Oil: 19,447 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
263 BBL/mo
Di (annual)
17.8%
b-factor
0.0
EUR
17,669 BBL
R-squared
0.656
type
exponential
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 4 | 42-287-31992 | NOBLE PRODUCING COMPANY INC. | 1 | 5,750 | 1986-11-21 |