Fields: CHENANGO, EAST (9560 FRIO)
Cum Oil
0 BBL
Cum Gas
0 MCF
Wells
1
Production
1993-01 — 1993-08
Peak Month
1993-01
Production History
Cum Oil: 0 BBL Cum Gas: 0 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2 | 42-039-31976 | EQUITABLE PETROLEUM CORP. | 3 | 10,600 | 1988-05-10 |