Fields: ALABAMA FERRY (GLENROSE D, WEST)
Cum Oil
29k BBL
Cum Gas
0 MCF
Wells
1
Production
2012-01 — 2026-03
Peak Month
2012-08
Production History
Cum Oil: 28,725 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
375 BBL/mo
Di (annual)
11.9%
b-factor
0.0
EUR
37,650 BBL
R-squared
0.643
type
exponential
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-289-31976 | TREADSTONE ENERGY PARTNERS, LLC | 1 | 10,750 | 2011-10-25 |