Fields: CHAPEL HILL (RODESSA)
Cum Oil
653 BBL
Cum Gas
0 MCF
Wells
1
Production
1993-01 — 1995-01
Peak Month
1993-03
Production History
Cum Oil: 653 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
103 BBL/mo
Di (annual)
231.9%
b-factor
0.0
EUR
531 BBL
R-squared
0.499
type
exponential
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-423-30631 | CLEMCO | 1 | 8,600 | 1982-10-22 |