Fields: OVERTON, E. (WOODBINE)
Cum Oil
6k BBL
Cum Gas
0 MCF
Wells
1
Production
1993-11 — 1995-09
Peak Month
1994-03
Production History
Cum Oil: 6,133 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
369 BBL/mo
Di (annual)
62.4%
b-factor
2.0
EUR
49,457 BBL
R-squared
0.578
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-401-32472 | PALMER PETROLEUM INC. | 1 | 3,600 | 1993-09-28 |