Fields: CHAPEL HILL (TRAVIS PEAK)
Cum Oil
28k BBL
Cum Gas
0 MCF
Wells
1
Production
1993-09 — 2026-03
Peak Month
1993-10
Production History
Cum Oil: 27,896 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
118 BBL/mo
Di (annual)
4.3%
b-factor
0.0
EUR
28,922 BBL
R-squared
0.316
type
exponential
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-423-31404 | HARLETON OIL & GAS INC. | 1 | 8,700 | 1993-06-30 |