Fields: DAVIDSON CHAPEL (WOODBINE)
Cum Oil
61k BBL
Cum Gas
0 MCF
Wells
1
Production
1996-04 — 2017-10
Peak Month
1996-04
Production History
Cum Oil: 61,461 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
675 BBL/mo
Di (annual)
15.9%
b-factor
0.1
EUR
56,471 BBL
R-squared
0.843
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-203-32359 | HARLETON OIL & GAS INC. | 1 | 4,000 | 1996-02-16 |