Fields: POLLARD (CADDO)
Cum Oil
27k BBL
Cum Gas
0 MCF
Wells
1
Production
1996-08 — 2026-03
Peak Month
1996-09
Production History
Cum Oil: 27,229 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
210 BBL/mo
Di (annual)
18.2%
b-factor
0.9
EUR
30,169 BBL
R-squared
0.693
type
hyperbolic
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-049-30922 | BRITTANY DRILLING CO. | 1 | 2,256 | 1996-08-14 |