Fields: BALLINGER, WEST (JENNINGS)
Cum Oil
13k BBL
Cum Gas
0 MCF
Wells
2
Production
1994-03 — 2026-03
Peak Month
1994-04
Production History
Cum Oil: 12,601 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
958 BBL/mo
Di (annual)
93.8%
b-factor
0.0
EUR
12,239 BBL
R-squared
0.531
type
exponential
Wells (2)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 1 | 42-399-34298 | PIONEER ENERGY CORPORATION | 3 | 4,500 | 2016-10-13 |
| 3 | 42-399-34341 | PIONEER ENERGY CORPORATION | 2 | 4,500 | 1997-06-17 |