Fields: BALLINGER (PALO PINTO)
Cum Oil
2k BBL
Cum Gas
0 MCF
Wells
1
Production
1996-04 — 2006-04
Peak Month
1996-05
Production History
Cum Oil: 1,983 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
128 BBL/mo
Di (annual)
61.4%
b-factor
0.0
EUR
2,479 BBL
R-squared
0.525
type
exponential
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2 | 42-399-34421 | PIONEER ENERGY CORPORATION | 1 | 4,500 | 1995-12-22 |