Fields: DAVIS (PALO PINTO)
Cum Oil
3 BBL
Cum Gas
0 MCF
Wells
1
Production
2014-11 — 2018-05
Peak Month
2015-03
Production History
Cum Oil: 3 BBL Cum Gas: 0 MCF
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2 | 42-399-34407 | PIONEER ENERGY CORPORATION | 4 | 4,500 | 2014-10-30 |