Fields: BALLINGER (PALO PINTO)
Cum Oil
721 BBL
Cum Gas
0 MCF
Wells
1
Production
2018-03 — 2026-01
Peak Month
2018-10
Production History
Cum Oil: 721 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
84 BBL/mo
Di (annual)
265.4%
b-factor
0.0
EUR
379 BBL
R-squared
0.503
type
exponential
Wells (1)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 2 | 42-399-34375 | PIONEER ENERGY CORPORATION | 2 | 4,500 | 2018-01-30 |