Fields: MCCAMEY
Cum Oil
25k BBL
Cum Gas
0 MCF
Wells
4
Production
1993-01 — 2026-03
Peak Month
1996-04
Production History
Cum Oil: 25,342 BBL Cum Gas: 0 MCF
Decline Curve Analysis
qi
321 BBL/mo
Di (annual)
50.2%
b-factor
0.4
EUR
12,388 BBL
R-squared
0.550
type
hyperbolic
Wells (4)
| WELL# | API | OPERATOR | PERMITS | DEPTH | LAST_ISSUED |
|---|---|---|---|---|---|
| 5D | 42-461-33558 | PEERY, J. W. | 1 | 2,400 | 1995-06-30 |
| 1 | 42-461-00814 | PEERY, J. W. | 1 | 2,327 | 1985-08-23 |
| 4 | 42-461-00816 | PEERY, J. W. | 1 | 2,364 | 1985-08-23 |
| 2 | 42-461-03970 | -- | -- | -- | -- |