42-003-02907
Final CompletionSTATE UNIVERSITY -Y-
ANDREWS County · District 8 · GRACE PETROLEUM CORP. · FASKEN (WOLFCAMP)
Permits
1
Max Depth
9,129 ft
First Permit
1987-10-07
Latest Activity
1987-10-07
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1960-04-01
Shut-In
—
Plugged
1983-05-12
!
EWA / Permit operator mismatch
Scheduling: GRACE PETROLEUM CORP. ≠ Permit: SANTA FE PIPELINE COMPANY
Resolved via: scheduling → GRACE PETROLEUM CORP.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2023-10
Operator History
originally filed by SANTA FE PIPELINE COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#336405 A SANTA FE PIPELINE COMPANY
received 1987-09-24
Well Details
- Well Number
- 5
- Max Depth
- 9,129 ft
- Drill Type
- Vertical
- County
- ANDREWS
- District
- 8
- Operator
- GRACE PETROLEUM CORP.
- Completed
- 1960-04-01
Operator
- Name
- GRACE PETRO CORP
- Location
- TULSA
- P-5 Status
- Y (filed 1993-02-03)
- Cum Oil (all leases)
- 7,729 bbl
- Cum Gas (all leases)
- 1,302,202 mcf
- Total Permits
- 280