42-003-37805

INJECTION

SCARBOROUGH - LINEBERRY

ANDREWS County · District 8 · TEXLAND PETROLEUM L.P. · FULLERTON (SAN ANDRES)

RRC Lookup

Permits

2

Max Depth

4,900 ft

First Permit

1996-02-23

Latest Activity

1996-02-23

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2016-06-09

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: TEXLAND PETROLEUM L.P. ≠ Permit: TEXLAND/JMC JOINT VENTURE

Resolved via: schedulingTEXLAND PETROLEUM L.P.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-04

Last Production

2026-03

Operator History

originally filed by TEXLAND/JMC JOINT VENTURE — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#445116 A TEXLAND/JMC JOINT VENTURE
received 1996-10-21
#445116 A TEXLAND/JMC JOINT VENTURE
received 1996-02-22

Well Details

Well Number
1139
Max Depth
4,900 ft
Drill Type
Vertical
County
ANDREWS
District
8
Completed
2016-06-09

Operator

Location
FORT WORTH
P-5 Status
Y (filed 2025-08-04)
Cum Oil (all leases)
50,998,911 bbl
Cum Gas (all leases)
6,547,111 mcf
Activities
OPRS/G, OPRS/O
Total Permits
674

External Links

Live © 2026 Petrora