42-003-40625

Final Completion

UNIVERSITY 26

ANDREWS County · District 8 · RING ENERGY INC. · SHAFTER LAKE (SAN ANDRES)

RRC Lookup

Permits

1

Max Depth

6,000 ft

First Permit

2008-07-14

Latest Activity

2008-07-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2008-12-20

Shut-In

Plugged

2020-11-13

!

EWA / Permit operator mismatch

Scheduling: RING ENERGY INC. ≠ Permit: PACESETTER ENERGY, INC.

Resolved via: productionRING ENERGY, INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2008-03

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#665019 A PACESETTER ENERGY, INC.
received 2008-06-20

Well Details

Well Number
6
Max Depth
6,000 ft
Drill Type
Vertical
County
ANDREWS
District
8
Completed
2008-12-20

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
41,782,424 bbl
Cum Gas (all leases)
407,870 mcf
Activities
GTHS/O, OPRS/G, OPRS/O
Total Permits
961

External Links

Live © 2026 Petrora