42-003-45450

INJECTION

MILAN

ANDREWS County · District 8 · PARALLEL PETROLEUM LLC · BLOCK A-34 (SAN ANDRES)

RRC Lookup

Permits

2

Max Depth

9,300 ft

First Permit

2013-06-13

Latest Activity

2013-06-13

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2013-08-25

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: PARALLEL PETROLEUM LLC ≠ Permit: FORGE ENERGY, LLC

Resolved via: schedulingPARALLEL PETROLEUM LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2013-08

Last Production

2026-03

Operator History

originally filed by FORGE ENERGY, LLC — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#763962 A FORGE ENERGY, LLC
received 2014-01-21
#763962 A FORGE ENERGY, LLC
received 2013-06-04

Well Details

Well Number
2410
Max Depth
9,300 ft
Drill Type
Vertical
County
ANDREWS
District
8
Completed
2013-08-25

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
13,037,726 bbl
Cum Gas (all leases)
324,442 mcf
Activities
OPRS/O
Total Permits
254

External Links

Live © 2026 Petrora