42-003-47736
TEXAS TEA
ANDREWS County · District 8 · PARALLEL PETROLEUM LLC · SHAFTER LAKE N. (SAN ANDRES)
Permits
2
Max Depth
10,000 ft
First Permit
2018-02-02
Latest Activity
2018-02-02
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2018-06-07
Shut-In
—
Plugged
2018-06-08
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2002-06
Last Production
2026-03
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#835736 A PARALLEL PETROLEUM LLC
received 2018-05-21
#835736 A PARALLEL PETROLEUM LLC
received 2018-01-29
Lat 32.482211
Lon -102.733487
Well Details
- Well Number
- 1
- Max Depth
- 10,000 ft
- Drill Type
- Vertical
- County
- ANDREWS
- District
- 8
- Operator
- PARALLEL PETROLEUM LLC
- Completed
- 2018-06-07
Operator
- Name
- PARALLEL PETRO LLC
- Location
- MIDLAND
- P-5 Status
- Y (filed 2025-10-04)
- Cum Oil (all leases)
- 13,037,726 bbl
- Cum Gas (all leases)
- 324,442 mcf
- Activities
- OPRS/O
- Total Permits
- 254