42-003-47736

TEXAS TEA

ANDREWS County · District 8 · PARALLEL PETROLEUM LLC · SHAFTER LAKE N. (SAN ANDRES)

RRC Lookup

Permits

2

Max Depth

10,000 ft

First Permit

2018-02-02

Latest Activity

2018-02-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2018-06-07

Shut-In

Plugged

2018-06-08

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2002-06

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#835736 A PARALLEL PETROLEUM LLC
received 2018-05-21
#835736 A PARALLEL PETROLEUM LLC
received 2018-01-29
Lat 32.482211
Lon -102.733487

Well Details

Well Number
1
Max Depth
10,000 ft
Drill Type
Vertical
County
ANDREWS
District
8
Completed
2018-06-07

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
13,037,726 bbl
Cum Gas (all leases)
324,442 mcf
Activities
OPRS/O
Total Permits
254

External Links

Live © 2026 Petrora