42-003-48043

PRODUCING Horizontal

UNIVERSITY 14SQ

ANDREWS County · District 8 · RING ENERGY INC. · SHAFTER LAKE (SAN ANDRES)

RRC Lookup

Permits

3

Max Depth

5,100 ft

First Permit

2019-03-15

Latest Activity

2023-07-17

Lifespan

4 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2024-02-24

Shut-In

Plugged

P-5 Org Status: X

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2024-02

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#891804 A RING ENERGY, INC.
received 2023-07-03
#850969 A RING ENERGY, INC.
received 2019-04-11
#850969 A RING ENERGY, INC.
received 2019-03-12
Lat 32.415711
Lon -102.708248

Well Details

Well Number
1402H
Max Depth
5,100 ft
Drill Type
Horizontal
County
ANDREWS
District
8
Completed
2024-02-24

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
41,782,424 bbl
Cum Gas (all leases)
407,870 mcf
Activities
GTHS/O, OPRS/G, OPRS/O
Total Permits
961

External Links

Live © 2026 Petrora