42-005-30244

Final Completion [SWD] Water

PARKER POINT SWD

ANGELINA County · District 6 · P.O.S. ENERGY INC. · MCGEE BEND (AUSTIN CHALK)

RRC Lookup

Permits

1

Max Depth

3,000 ft

First Permit

1996-04-16

Latest Activity

1996-04-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-06-18

Shut-In

Plugged

2007-08-02

!

EWA / Permit operator mismatch

Scheduling: P.O.S. ENERGY INC. ≠ Permit: WEBER ENERGY CORPORATION

Resolved via: schedulingP.O.S. ENERGY INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-03

Last Production

2007-08

Operator History

originally filed by WEBER ENERGY CORPORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#446969 A WEBER ENERGY CORPORATION
received 1996-04-15

Well Details

Well Number
1
Max Depth
3,000 ft
Drill Type
Vertical
County
ANGELINA
District
6
Completed
1996-06-18

Operator

Location
BUNA
P-5 Status
Y (filed 2021-08-06)
Cum Oil (all leases)
105,947 bbl
Cum Gas (all leases)
24,228 mcf
Total Permits
2

External Links

Live © 2026 Petrora