42-005-30277
Final CompletionANGELINA LUMBER CO. A
ANGELINA County · District 6 · PALMER PETROLEUM INC. · REDLAND NE (TRAVIS PEAK)
Permits
1
Max Depth
12,000 ft
First Permit
2006-07-13
Latest Activity
2006-07-13
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2007-02-28
Shut-In
—
Plugged
2012-11-29
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2007-02
Last Production
2012-11
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#622194 A PALMER PETROLEUM INC.
received 2006-07-07
Well Details
- Well Number
- 2
- Max Depth
- 12,000 ft
- Drill Type
- Vertical
- County
- ANGELINA
- District
- 6
- Operator
- PALMER PETROLEUM INC.
- Completed
- 2007-02-28
Operator
- Name
- PALMER PETRO INC
- Location
- SHREVEPORT
- P-5 Status
- Y (filed 2025-06-04)
- Cum Oil (all leases)
- 2,589,635 bbl
- Cum Gas (all leases)
- 69,632,950 mcf
- Total Permits
- 304