42-005-30358
Final CompletionANGELINA LUMBER COMPANY D
ANGELINA County · District 6 · PALMER PETROLEUM INC. · REDLAND NE (TRAVIS PEAK)
Permits
1
Max Depth
12,200 ft
First Permit
2008-06-25
Latest Activity
2008-06-25
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
2008-12-28
Shut-In
—
Plugged
2012-10-31
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2008-12
Last Production
2012-10
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#663673 A PALMER PETROLEUM INC.
received 2008-06-04
Well Details
- Well Number
- 1
- Max Depth
- 12,200 ft
- Drill Type
- Vertical
- County
- ANGELINA
- District
- 6
- Operator
- PALMER PETROLEUM INC.
- Completed
- 2008-12-28
Operator
- Name
- PALMER PETRO INC
- Location
- SHREVEPORT
- P-5 Status
- Y (filed 2025-06-04)
- Cum Oil (all leases)
- 2,589,635 bbl
- Cum Gas (all leases)
- 69,632,950 mcf
- Total Permits
- 304