42-009-33885

Final Completion

MOORE GRACE ABNEY

ARCHER County · District 9 · JAMES OPERATING · HINSON (CADDO)

RRC Lookup

Permits

1

Max Depth

5,600 ft

First Permit

1979-09-19

Latest Activity

1979-09-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-12-27

Shut-In

Plugged

1997-07-15

!

EWA / Permit operator mismatch

Scheduling: JAMES OPERATING ≠ Permit: HINSON BROTHERS

Resolved via: schedulingJAMES OPERATING

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2003-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#58352 A HINSON BROTHERS
received 1979-09-19

Well Details

Well Number
1
Max Depth
5,600 ft
Drill Type
Vertical
County
ARCHER
District
9
Completed
1979-12-27

Operator

Location
IOWA PARK
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
40,112 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O
Total Permits
2

External Links

Live © 2026 Petrora